VEMPL Supplied domestic pumpsets including foot valves& Accessories at New Mandala water pump house in BARC
Project Type : Mechanical (SITC job)
Products Supplied by VEMPL:
HSC Pumpsets, valves, foundations,
Suction & Delivery pipeline
How did we execute the project?
1. Obtaining permission from BARC officials – Submitting medical certificates for fitness and ID proofs throughout the duration of the project’s completion.
2. On-site material supply
3. Constructing pump foundations in accordance with BARC guidelines
4. A visual inspection by a BARC official following the completion of each small task.
5. Installing and testing the installed system
Roadblocks faced
1. Lack of space was a problem. To allow us to lay the suction and delivery pipeline, we had intended to forgo the foundation work. Later , it was decided to burst through the wall to install suction and delivery pipes, W e did it successfully.
2. For welding work, we deployed a 6G qualified welder.
3. The installation of the foot valve required working 18 feet below the surface, which was a dif ficult task for the technicians.
4. We had to cut the water tank’ s core to allow the suction line to be installed successfully.
Benefit gained by the customer post successful installation
Saved time required for water storage
Project Commissioning Images